Site icon Premium Researchers

KINK-BANDS ACROSS THE SCALES – A STRUCTURAL GEOLOGY ENIGMA

Do You Have New or Fresh Topic? Send Us Your Topic

KINK-BANDS ACROSS THE SCALES – A STRUCTURAL GEOLOGY ENIGMA

 

 

Abstract and Figures

The structural geology and tectonic setting of hydrothermal gold deposits are paramount for understanding their genesis and for their exploration. Strong structural control on mineralization is one of the defining features of these deposits and arises because the permeabilities of crustal rocks are too low to allow the formation of hydrothermal deposits on realistic timescales unless rocks are deformed.
Deformation zones and networks of deformation zones are the fundamental structures that control mineralization. Systematically analyzing deposit geometry, kinematics, and dynamics leads to the most thorough comprehension of a deposit. Geometric analysis relates orebody shape to controlling structures, and networks of deformation zones can be analyzed using topol-ogy to understand their connectivity and mineralizing potential.
Kinematic analysis determines the location of permeability creation and mineralization. New views of shear zone kinematics allow for variable ratios of pure to simple shear, which change likely directions of mineralization. Multiple orientations of mineralized deformation zones may form simultaneously and symmetrically about the principal strain axes.
Dynamic analysis is necessary for a mechanical understanding of deformation, fluid flow, and mineralization and can be achieved through numerical modeling. The relationship between deformation (kinematics) and stress (dynamics) constitutes the rheology; rheological contrasts are critical for the localization of many deposits. Numerous gold deposits, especially the largest, have evidence for multiple mineralizing events that may be separated by tens to hundreds of millions of years.
In these cases, reactivation of structures is common, and a range of orientations of preexisting structures are predicted to be reactivated, given that they are weaker than intact rock. Physical and chemical processes of mineralization can be integrated using a nonequilibrium thermodynamics approach. Hydrothermal gold deposits form in contractional, strike-slip, and extensional tectonic settings.
However, there may be great variation in the spatial scale over which the tectonic setting applies, and tectonic settings may also change on rapid timescales, so that it is inadvisable to infer local tectonics from deposit-scale patterns, and vice versa. It is essential to place mineralizing events within a complete geologic history in order to distinguish pre-and postmineralizing structures from synmineralization deformation features.

 

Do You Have New or Fresh Topic? Send Us Your Topic 

 

TABLE OF CONTENT
Title page- – – – – – – – – i
Approval page – – – – – – – -ii
Dedication – – – – – – – – -iii
Acknowledgement – – – – – – – -iv
Abstract – – – – – – – – – -v
Table of content – – – – – – – -vi

CHAPTER ONE
INTRODUCTION – – – – – – – -1
1.0 Background of the study – – – – -1
1.1 Statement of the problem – – – – -5
1.2 Purpose of the study – – – – – -6
1.3 Significance of the study – – – – -8
1.4 Research questions – – – – – -9
1.5 Scope of the study – – – – – – -10

CHAPTER TWO

LITERATURE REVIEW – – – – – – -11

CHAPTER THREE

Research methodology – – – – – – -39
Design of study – – – – – – – -40

CHAPTER FOUR

Presentation, analysis and interpretation of data – -48

CHAPTER FIVE

Summary of findings – – – – – – -60
Conclusion – – – – – – – – -61
Recommendations – – – – – – – -62
Suggestions for further research – – – – -64
References – – – – – – – – -65
Appendix I – – – – — – – – -68
Questionnaire. – – – – – – – -69

 

 

KINK-BANDS ACROSS THE SCALES – A STRUCTURAL GEOLOGY ENIGMA

 

Not What You Were Looking For? Send Us Your Topic

INSTRUCTIONS AFTER PAYMENT

After making payment, kindly send the following:

» Send the above details to our email; contact@premiumresearchers.com or to our support phone number; (+234) 0813 2546 417 . As soon as details are sent and payment is confirmed, your project will be delivered to you within minutes.